Wednesday, 16 October 2013

Latest Project - A stitch in time.........

This week it is a report from our contracts division.  That well known phrase "a stitch in time saves nine" is especially applicable to retaining wall alongside fast flowing water.  We have seen £1,500 repointing projects become £150,000 reconstruction jobs.
Before

After
Recently we were commissioned by a long standing client to do some wall maintenance ahead of the winter, here are some of the results.  It is never going to look like a new wall, but a measure of integrity has been restored.
Before

After
When budgets allow a complete repoint is probably on the cards, but now the wall looks like it will survive the winter.
Tidy

Wednesday, 5 December 2012

Latest Project - Waterloo

No, not the battle, the ABBA song, or even the sunset, it's the Bridge we are talking about today.  Bridges over the thames hold a special place in our hearts at Up and Under. 

The inspection of Battersea Bridge in 1988 was our first and since then we have undertake dozens of projects on 15 of the road crossings on the tidal Thames in the centre of London.
Correct Bridge....... Check!
They are all special in their own way, either because of their design or because of a feature of the particular project, but most of us enjoy the time in the spotlight that Tower bridge commands.  Anyway, back to today's story:

This job comprised the inspection of the internal parts of the piers.  We collected a range of condition and dimensional data in order to prepare a report for our client. 

It is essential everyone knows what they are doing here!
The project relied on a wide range of our skills.  Working on the Thames requires consideration of tides, arrangement of safety boats and liaison with the Port of London, with whom we have an excellent, long standing relationship.
Mucky but still smiling
Internally we needed a carefully devised combination of confined spaces and rope access techniques plus bridge engineering expertise to meet the technical and safety elements of the brief.

This is the type of job where we excel and we will be back in London very soon to examine another landmark.

Rope access or confined spaces, inspection or maintenance contact us 01270 589615

Friday, 2 November 2012

Highways Agency Area 10 - Reflections on 5 years of good stuff

This weekend will see the end of AOne+'s stewardship of Highways Agency Area 10. During this time we have had the pleasure of working with a great team based in Warrington.

We have looked back over the past five years of helping to manage this vitally important component in the country’s infrastructure and have come up with a few highlights. Our contribution to keeping the Trunk Roads of the North West in good order have included: 
  • More than 2,500 General Bridge Inspections
  • Over 1,500 Principal Inspections
  • Inputting over 4,500 inspection reports into SMIS
  • Checking and updating inventories of ~50 Pre-opening and end of defect liability inspections
  • Assessing 215 structures for susceptibility to scour
  • Carrying out more than 350 inspections following heavy rainfall/flood events
  • Undertaking numerous special and monitoring inspections
  • Monitoring the piers, half-joints and internal sections of Bidston Viaduct on a quarterly basis prior to completion of the strengthening works between 2007 -2010
  • Assessing thousands of structures to determine their resilience against terrorism
  • Monitoring bearings on Thelwall Viaduct and other structures
  • Installing (pier location ) reference labelling to help the emergency services
  • Helping to maintain the highway lighting
  • Installing security measures to reduce the threat of vandalism and terrorism
  • Removing graffiti, clearing trash screens, plus clearing and greasing flap valves
  • Cleaning and greasing bearings on rail structures
  • Determining traffic management, access and rail access requirements plus liaising with specialist suppliers
  • In the past year alone, cleaning and removing ~10 tonnes of pigeon droppings from structures, plus installing kilometres of pigeon spikes
  • Maintaining and checking AOne+ work at height safety equipment (harnesses and lanyards)
  • Solving access problems involving rope access and confined spaces working, work over and alongside deep water, the use of boats and pontoons and reacting to the joys of the british weather. 
 This has been a mammoth effort by our team, frequently working through the night, in all weathers, solving problems as they arose and innovating to meet the clients, the HA’s and the public’s needs for efficiency and safety.

None of this could have been achieved without the spirit of cooperation between ourselves and the AOne+ team. We would like to thank them all for embracing our ‘get it done’ approach.

It remains only to say thank you to all of our team members who have contributed so much over the past five years to the success of this project and to wish all those moving on to the next contract from AOne+ all the best for the future.

Our skill, enthusiasm and experience is available to all Highways Area Trunk Road managers. Contact us 01270 589615 ask for Miles.

Wednesday, 24 October 2012

Masonry Repairs to Railway Viaduct

Up and Under (Specialist Contracts) recently completed a repair contract on a masonry viaduct next to the Helmshore Textile Museum between Haslingden and Ramsbottom in Lancashire.  This type of safe work at height is routine for our Contracts Division and we deal with all of the safety and environmental paperwork, if required.

Mortar injection for deep joints
The works included:
  • Vegetation removal
  • Joint raking
  • Re-pointing
  • Masonry replacement
Most of the works were undertaken by our skilled team members using rope access to minimise cost and inconnvenience.

Areas prepared for masonry replacement
We are happy to discuss your repair and maintenance needs whether specialist access or routine.

Contact us for a quote, or advice.

Wednesday, 10 October 2012

Helping Amey Keep Sheffield Running

 We recently completed two culvert condition surveys for Amey as part of their Sheffield PFI contract.  Up and Under are a long standing supplier to Amey of a range of services including speciailst access inspection investigation and testing services.

This job  involved the inspection of two culverts to determine their condition plus gathering data to allow the highway load capacity to be assessed.  Inspecting these hidden parts of the transport network is essential to its effective and safe operation. 

As you see, it is not an easy place to work, but with the right team, training and equipment we are able to undertake the works safely and professionally.

If you need culverts inspecting or repairing we are happy to discuss your needs. Our services include:

  • Inspection
  • Training
  • Repairs
  • Survey
  • Dimensional checks
  • Intrusive investigation 
  • Safety escort
  • Rescue services
Confined spaces, over water or rope access call 01270 589615

 
 
 
 

Wednesday, 26 September 2012

CPD Feedback

The first CPD event of Andy's 2012/13 tour happened last night and it looks like it got off to a great start.  One person said " This is my first ICE event, I was absolutely blown away by your talk, excellent!"  This made the drive down and back through torrential downpours worthwhile.  There are further events in November and January at various locations around the UK.

Feedback

If you want more information or to book a CPD presentation see this link for details.

Thursday, 20 September 2012

Free CPD Seminars

We are once again offering a range of lunch time CPD seminars to professionals and trainees in the construction, maintenance and asset management industries.  If you want us to present at your office or site please contact us.
Some of the subject matter
Those of you who have attended our talks in the past know that they are not thinly veiled sales pitches.  They are packed with useful practical information.  They typically last 30 minutes plus as much time as you need for questions.

Andy in full flow
You want more info click here

Thursday, 12 January 2012

Grant's Leap of Faith


Beautiful workspaces created by Zenith Interior Contracts
Grant Williams, Director at Up and Under (Specialist Contracts) Ltd, comes from the world of ceiling tiles, glass partitions and exquisite joinery provided by Zenith Interiors Contracts - the company he founded, which is now part of the Up and Under Group.

The walk to work
Here though, he shows he has no fear of the outdoors by joining his Specialist Contracts team on a project to remove potentially dangerous loose material off a disused railway viaduct.

It doesn't look too high..........

Until you look at it like this!