Tuesday, 30 July 2013

Latest Project - Bridge Delamination Survey

Up and Under were contacted by our client to undertake a hammer tap survey and remove loose concrete from a highway structure following reports of concrete falling from the bridge.

 

The  high level viaduct carries one of the main arterial routes in the North West and local companies occupy areas below the structure.
 
Fortunately we were able to react immediately and our inspectors were able inspect the structure and remove the loose concrete ensuring the safety of the occupants of the area under the bridge.
We will be returning again soon to carry out a full detailed inspection of the whole structure.
 
Do you have a problem requiring a solution?
 
Give us a call on 01270 589615
 
Problem Solved.

No comments:

Post a Comment