A team from Up and Under Limited completed an investigation project last week in South Wales to determine the thickness and construction of a section of highway retaining wall.
Dense vegetation and a steep slope below the wall did not prevent the team from completing the works using rope access.  These techniques are very effective in terms of time cost and disruption.  We have also used these techniques on buildings and bridges to avoid disturbance of environmentally sensitive areas and also over water.

On this project we utilised euipment with the capacity to remove core samples up to 3m from the surface.  We have the capability to drill holes to depths in excess of 15m where required.

If you want further information contact Rob on 01270 589615 or rob@upandundergroup.com